Field Tank Construction
New Tank Construction – Mine Diesel Tank
The 122,827BBL tank went from mobilization to mechanical completion in just over two and a half months. Working in close proximity with civil and piping contractors in the area provided a unique challenge in maneuvering equipment and coming up with creative, yet safe ways to access the tank area. Through excellent communication and teamwork, this tank was completed safely and ahead of schedule.
Project Highlights:
- Multi-column, internal rafter roof complete with cable-suspended internal floating roof
- CWB spiral staircase including roof top platform, catwalk assembly, radial shell platforms, access ladders and roof perimeter handrail
- Complete hydrostatic test including roof floating, and 3D scan post hydro for detailed strapping table
- Project Size: 127’-7 ½” Diameter x 57’-9 11/16” High
- Project Type: New Construction
- Completion Date: September 2017
- Service: Diesel
More Projects
New Tank Construction – Growing Client’s Inventory Capacity
An addition to their site in Central Alberta, meant this clients overall storage capacity at their rail terminal would be more than…
New Tank Construction – Central Alberta
This 70,000 bbl tank moved from concept to completion in just over (3) months. Due to market volatility in 2020, the client…
Inner City Tank Construction
With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the…
Tank Repair – Major Foundation Remediation & Tank Floor Replacement
This unique project required the existing tank to be elevated 4’ above its existing granular base. The 110’-0” diameter, multi-bay tank was…
Turnkey Operations On A Liquid Sulphur Tank – Central AB
Customer required an 8500 MT (30,000BBL) molten sulphur tank to be constructed. Elite Integrity Services executed a large scale turnkey operation on…