New Tank Construction – Growing Client’s Inventory Capacity
An addition to their site in Central Alberta, meant this clients overall storage capacity at their rail terminal would be more than…
An addition to their site in Central Alberta, meant this clients overall storage capacity at their rail terminal would be more than…
This 70,000 bbl tank moved from concept to completion in just over (3) months. Due to market volatility in 2020, the client…
With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the…
This unique project required the existing tank to be elevated 4’ above its existing granular base. The 110’-0” diameter, multi-bay tank was…
Customer required an 8500 MT (30,000BBL) molten sulphur tank to be constructed. Elite Integrity Services executed a large scale turnkey operation on…
Elite Integrity Services was recently contracted to complete an entire tank replacement project inside our clients 5-day turn around window. Working closely…
A large expansion to an existing facility in Northeast British Columbia including (8) tanks of varying sizes to be constructed within the…
Elite was contracted to supply and install a replacement carbon steel pontoon floating roof into an existing 120’-0” diameter tank. Following the…
This project was executed in a remote desert location with extremely hot temperatures and nearby forest fires. The crews were challenged to…
This new 70,000 bbl gasoline storage tank was constructed in the middle of a highly congested, fully operational facility in Northeastern British…
Elite’s team was required to develop some creative engineering and operational solutions to support this high profile pulp mill shut down project…
Working with our client at the onset to understand their needs, Elite was able to design, construct, and safely execute this project…
When a Client has a unique problem, they require a unique solution! For this major repair project, Elite was contracted to restore…
The 115,576 BBL multi-bay, storage tank went from mobilization to mechanically complete in just over two and a half months. Tank construction included a…
For this project Elite had to replace the tank floor and annular plates, as well as provide a new foundation to elevate…
This project included the construction of (3) new tanks to be built in Central Alberta. The tanks all required hydro-testing, external painting,…
Three 30,000 bbl tanks required completion in a compressed schedule. Working with operations a revolving schedule was developed to accommodate continuous construction…
Due to extreme soil side erosion, Elite was contracted to replace the entire annular plate on a 110’ diameter boiler feed water…
Three 30,000 bbl tanks required completion in a compressed schedule. Working closely with operations, a revolving schedule was developed to accommodate continuous…
Project Highlights: Tank Size: 55’-0” DIA x 55’-0” HG Tank Access: 9’-2 ½” HG x 11’-0” WD Door Sheet Crane Access: (1)…
To support expanding infrastructure of its assets, Elite’s client required the construction of a 100,000 bbl and 10,000 bbl storage tank at…
INTRO: Worked with a new, small company to construct trailer mounted separation system. Project Highlights: Fabrication of (2) carbon steel cone bottom…
INTRO: Platforms and Staircases Project Highlights: Over the past years Elite Integrity Services have been asked to design and fabricate all shapes…
An aging storage tank built in 1977 had undergone various service changes in its lifetime resulting in severe upper shell and roof…
This tank required multiple repairs to the foundation, tank floor and external floating roof. Various project constraints resulted in searching out alternative…
Elite’s client required three new tanks constructed in a short schedule. In five months, Elite successfully completed and turned over three 40,000…
Due to environmental conditions at site Elite worked with their client to fabricate structural steel skids for tank foundations in lieu of…
Working with the client it was determined that a structurally supported roof was not suitable for the tank operation. Elite engineered, pre-fabricated…
Unique safety challenges are not uncommon when it comes to tank repairs and maintenance. This project was unlike many due to the…
Due to the remote location special considerations were made to ensure the crew had suitable accommodations and attention was paid to work…
The 122,827BBL tank went from mobilization to mechanical completion in just over two and a half months. Working in close proximity with…
Engaged by the client prior to an out of service inspection created the opportunity to work with an evolving scope. Having a…
Six 10,000 bbl tanks required completion in a compressed schedule. Working with operations a revolving schedule was developed to accommodate continuous construction…
A unique project specifically in terms of location. Elite coordinated closely with the client to make arrangements to have equipments and material…