Custom Project – Trailer Skid Package
INTRO:
- Worked with a new, small company to construct trailer mounted separation system.
Project Highlights:
- Fabrication of (2) carbon steel cone bottom storage tanks.
- Fabrication of a heavy gauge Roof Structure c/w supports for installation of a building.
- Special attention required to Install the tanks and roof structure to a cambered trailer.
- Welding of exotic material such as Duplex 2205.
- Compressed schedule.
- Project Type: Trailer Skid Package
- Completion Date: 17th October 2018
More Projects
01
Central AB
New Tank Construction – Growing Client’s Inventory Capacity
An addition to their site in Central Alberta, meant this clients overall storage capacity at their rail terminal would be more than…
02
Central Alberta
New Tank Construction – Central Alberta
This 70,000 bbl tank moved from concept to completion in just over (3) months. Due to market volatility in 2020, the client…
03
East Central, Alberta
Inner City Tank Construction
With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the…
04
East Central Alberta
Tank Repair – Major Foundation Remediation & Tank Floor Replacement
This unique project required the existing tank to be elevated 4’ above its existing granular base. The 110’-0” diameter, multi-bay tank was…
05
Central, AB
Turnkey Operations On A Liquid Sulphur Tank – Central AB
Customer required an 8500 MT (30,000BBL) molten sulphur tank to be constructed. Elite Integrity Services executed a large scale turnkey operation on…