With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the duration of the project. A client specific lift plan was generated to address the challenges with where this tank was being constructed. Once onsite, this 20,000 BBL external rafter storage tank took our crew under 1 month to complete.
Project Highlights:
- Single center column supporting an external rafter roof.
- Internal coating of the floor and lower 1 meter of shell, as well as the roof and 1 meter down the shell.
- 3D scanning technology was utilized both pre and post hydro-testing.
- 0 TRIF and 0 LTI’s
- Project Size: (1) 70’-0” Diameter x 30’-0” High
- Project Type: New Tank Construction
- Completion Date: December 2020
- Service: Kerosene Distillate
More Projects
New Tank Construction – Growing Client’s Inventory Capacity
An addition to their site in Central Alberta, meant this clients overall storage capacity at their rail terminal would be more than…
New Tank Construction – Central Alberta
This 70,000 bbl tank moved from concept to completion in just over (3) months. Due to market volatility in 2020, the client…
Tank Repair – Major Foundation Remediation & Tank Floor Replacement
This unique project required the existing tank to be elevated 4’ above its existing granular base. The 110’-0” diameter, multi-bay tank was…
Turnkey Operations On A Liquid Sulphur Tank – Central AB
Customer required an 8500 MT (30,000BBL) molten sulphur tank to be constructed. Elite Integrity Services executed a large scale turnkey operation on…
Turn Around Tank Replacement
Elite Integrity Services was recently contracted to complete an entire tank replacement project inside our clients 5-day turn around window. Working closely…