Field Tank Construction
New Tank Construction – Multi Tank New Construction
Six 10,000 bbl tanks required completion in a compressed schedule. Working with operations a revolving schedule was developed to accommodate continuous construction and mitigate schedule loss with the challenging climate conditions, including severe winter conditions and consistent high winds. Three tanks required full internal coating and special insulated tarps were sourced to allow for cold weather application.
Project Highlights:
- Anchored storage tank design with an internal design pressure of 1 PSI
- Three completely internally coated tanks, and three tanks with floor and 3’-3” of shell coating
- External rafter design on three tanks
- Aggressive weather conditions including consistently high winds
- Project Size: 42’-6” Diameter x 40’-0” High
- Project Type: New Construction
- Completion Date: January 2018
- Service: Condensate and Produced Water Tanks
More Projects
New Tank Construction – Growing Client’s Inventory Capacity
An addition to their site in Central Alberta, meant this clients overall storage capacity at their rail terminal would be more than…
New Tank Construction – Central Alberta
This 70,000 bbl tank moved from concept to completion in just over (3) months. Due to market volatility in 2020, the client…
Inner City Tank Construction
With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the…
Tank Repair – Major Foundation Remediation & Tank Floor Replacement
This unique project required the existing tank to be elevated 4’ above its existing granular base. The 110’-0” diameter, multi-bay tank was…
Turnkey Operations On A Liquid Sulphur Tank – Central AB
Customer required an 8500 MT (30,000BBL) molten sulphur tank to be constructed. Elite Integrity Services executed a large scale turnkey operation on…