Field Tank Construction
New Tank Construction – Expanding Infrastructure Required New Tanks in Short Order
To support expanding infrastructure of its assets, Elite’s client required the construction of a 100,000 bbl and 10,000 bbl storage tank at their new terminal in Alberta. Timelines were a key factor in the success of this project, requiring strategic planning and coordination with the client and sub-contractors to execute successfully; all while facing extreme climatic conditions throughout the winter construction. With mechanical construction completed in early February, the tanks underwent successful winter hydrotests prior to the internal lining applications.
Project Highlights:
- Strategic planning and execution on the project front end ensured all engineering and shop fabrication was completed prior to on-site construction commencing.
- 0 TRIF, 0 LTI
- Crews successfully completed (2) simulated ERP drills onsite utilizing rescue equipment, trained practices and procedures.
- Close collaboration with all parties resulted in project being delivered ahead of schedule and under budget.
- Client feedback was quality of workmanship was excellent and representatives claimed “best tanks in the industry”
- Project Size: (1) 126’-0” Diameter x 48’-0” High Crude Oil Storage Tank (1) 48’-0” Diameter x 32’-0” High Condensate Tank
- Project Type: New Construction
- Completion Date: February 2020
- Service: Crude Oil & Condensate Storage
More Projects
New Tank Construction – Growing Client’s Inventory Capacity
An addition to their site in Central Alberta, meant this clients overall storage capacity at their rail terminal would be more than…
New Tank Construction – Central Alberta
This 70,000 bbl tank moved from concept to completion in just over (3) months. Due to market volatility in 2020, the client…
Inner City Tank Construction
With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the…
Tank Repair – Major Foundation Remediation & Tank Floor Replacement
This unique project required the existing tank to be elevated 4’ above its existing granular base. The 110’-0” diameter, multi-bay tank was…
Turnkey Operations On A Liquid Sulphur Tank – Central AB
Customer required an 8500 MT (30,000BBL) molten sulphur tank to be constructed. Elite Integrity Services executed a large scale turnkey operation on…