Field Tank Construction
New Tank Construction – Multi Tank Project Compressed Schedule
Three 30,000 bbl tanks required completion in a compressed schedule. Working closely with operations, a revolving schedule was developed to accommodate continuous construction and mitigate project downtime against challenging winter climate conditions
Project Highlights:
- Use of Wind Gird Scaffolding system.
- Large, 24” pre-coated internal piping assemblies.
- Minimal design changes supporting shop and logistic schedules.
- (4) month project duration including the installation of Sandborn Internal Floating Roofs.
- Internal Coating scheduled Spring 2019.
- Challenging winter climate conditions.
- Project Size: (1) 67’-0” Diameter x 48’-0” High & (2) 77’-0” Diameter x 36’-0
- Project Type: New Construction
- Completion Date: January 2019
- Service: Condensate & Crude Storage Tanks
More Projects
New Tank Construction – Growing Client’s Inventory Capacity
An addition to their site in Central Alberta, meant this clients overall storage capacity at their rail terminal would be more than…
New Tank Construction – Central Alberta
This 70,000 bbl tank moved from concept to completion in just over (3) months. Due to market volatility in 2020, the client…
Inner City Tank Construction
With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the…
Tank Repair – Major Foundation Remediation & Tank Floor Replacement
This unique project required the existing tank to be elevated 4’ above its existing granular base. The 110’-0” diameter, multi-bay tank was…
Turnkey Operations On A Liquid Sulphur Tank – Central AB
Customer required an 8500 MT (30,000BBL) molten sulphur tank to be constructed. Elite Integrity Services executed a large scale turnkey operation on…