Tank Repair & Restoration
Tank Repair – Client Needed an Elite Solution
When a Client has a unique problem, they require a unique solution!
For this major repair project, Elite was contracted to restore a failing tank crucial to the process operations of this northern Alberta SAGD site. Replace the deteriorating foundation, along with lower sections of the tank shell was Elite’s repair scope; working closely with the client and EPC, Elite was able to identify project efficiencies and eliminate unnecessary costs, aligning with the project objectives. Critical timelines were driving many of the project targets, therefore, Elite engaged with trusted sub-contractors to successfully design and execute this project ahead of schedule. Well planned, committed teamwork, permitted the complete replacement of the tank foundation, annular ring and floor plates while the tank remained in place.
Project Highlights:
- A failed foundation required supporting the tank shell and roof during remediation and construction activities
- Installed a new 84’ diameter concrete foundation beneath the tank while supported on jacking assemblies
- Installed annular plates around the entire perimeter of the tank along with new floor plates up the new foundation.
- 0TRIF, 0LTI
- Project Size: 84’-0” Diameter x 48’-0” High
- Project Type: Repair & Restoration
- Completion Date: March 2020
- Service: De-Oiled Water
More Projects
New Tank Construction – Growing Client’s Inventory Capacity
An addition to their site in Central Alberta, meant this clients overall storage capacity at their rail terminal would be more than…
New Tank Construction – Central Alberta
This 70,000 bbl tank moved from concept to completion in just over (3) months. Due to market volatility in 2020, the client…
Inner City Tank Construction
With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the…
Tank Repair – Major Foundation Remediation & Tank Floor Replacement
This unique project required the existing tank to be elevated 4’ above its existing granular base. The 110’-0” diameter, multi-bay tank was…
Turnkey Operations On A Liquid Sulphur Tank – Central AB
Customer required an 8500 MT (30,000BBL) molten sulphur tank to be constructed. Elite Integrity Services executed a large scale turnkey operation on…