Tank Repair & Restoration
Tank Repair – Floor Replacement & Major Foundation Installation
For this project Elite had to replace the tank floor and annular plates, as well as provide a new foundation to elevate the tank 3’-0” above its existing grade. Working closely with the civil engineering contractor, we we’re able to develop a design that was both fit for purpose, but also supported the tight schedule restraints of the project. Once the floor plates were removed, Elite installed a 3’-0” high containment ring which was filled with a high strength filcrete and allowed to cure. Once cured, the tank was lifted 3’-0” and a new, reinforced, concrete ring wall was installed. Upon completion of the ring wall, the tank was lowered onto its new foundation, where a new annular and floor plates were installed and grouted into place.
Project Highlights:
- Door sheet cut into tank shell for access
- New 3’-0” high concrete ring wall was installed while the tank was supported on hydraulic jacks
- Executed the entire scope of work, including hydrotest, in the allotted time frame of 60 days without incident.
- Project Size: 84’-0” Diameter x 42’-0” High
- Project Type: Repair & Restoration
- Completion Date: May 2019
- Service: Crude Oil
More Projects
New Tank Construction – Growing Client’s Inventory Capacity
An addition to their site in Central Alberta, meant this clients overall storage capacity at their rail terminal would be more than…
New Tank Construction – Central Alberta
This 70,000 bbl tank moved from concept to completion in just over (3) months. Due to market volatility in 2020, the client…
Inner City Tank Construction
With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the…
Tank Repair – Major Foundation Remediation & Tank Floor Replacement
This unique project required the existing tank to be elevated 4’ above its existing granular base. The 110’-0” diameter, multi-bay tank was…
Turnkey Operations On A Liquid Sulphur Tank – Central AB
Customer required an 8500 MT (30,000BBL) molten sulphur tank to be constructed. Elite Integrity Services executed a large scale turnkey operation on…