Tank Repair & Restoration
Tank Repair – New Operational Service
An aging storage tank built in 1977 had undergone various service changes in its lifetime resulting in severe upper shell and roof corrosion. The balance of the tank remained in very good condition and the client was exploring options for re-purposing the equipment. With consideration the original tank volume was no longer required it was determined the best option was to remove the upper three shell courses no longer required and install a new roof. Following the one-piece removal of the upper shell, a new self-supported, coned roof was installed and the tank was effectively repurposed.
- Project Size: 36’-6” Diameter x 48’-0” High
- Project Type: Tank Repair & Restoration
- Completion Date: August 2016
- Service: Condensate Tank
More Projects
New Tank Construction – Growing Client’s Inventory Capacity
An addition to their site in Central Alberta, meant this clients overall storage capacity at their rail terminal would be more than…
New Tank Construction – Central Alberta
This 70,000 bbl tank moved from concept to completion in just over (3) months. Due to market volatility in 2020, the client…
Inner City Tank Construction
With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the…
Tank Repair – Major Foundation Remediation & Tank Floor Replacement
This unique project required the existing tank to be elevated 4’ above its existing granular base. The 110’-0” diameter, multi-bay tank was…
Turnkey Operations On A Liquid Sulphur Tank – Central AB
Customer required an 8500 MT (30,000BBL) molten sulphur tank to be constructed. Elite Integrity Services executed a large scale turnkey operation on…