Field Tank Construction
New Tank Construction – Skid Supplied Foundations
Due to environmental conditions at site Elite worked with their client to fabricate structural steel skids for tank foundations in lieu of traditional concrete or gravel bases. Fabricated in sections in the shop, shipped to site and welded in place on piles, these bases were a great alternative and created a perfectly level surface to construct the tanks. Two 10,000 bbl tanks were constructed following installation of the skids structures.
Project Highlights:
- Two pre-fabricated base skids, installed in the field completed with top plate
- Internal double wrap heat coil designed to ABSA with partial registration
- Complete CWB stairs and platforms for tank access
- Project Size: 42’-6” Diameter x 40’-0” High
- Project Type: New Construction
- Completion Date: July 2015
- Service: Condensate and Produced Water Tanks
More Projects
New Tank Construction – Growing Client’s Inventory Capacity
An addition to their site in Central Alberta, meant this clients overall storage capacity at their rail terminal would be more than…
New Tank Construction – Central Alberta
This 70,000 bbl tank moved from concept to completion in just over (3) months. Due to market volatility in 2020, the client…
Inner City Tank Construction
With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the…
Tank Repair – Major Foundation Remediation & Tank Floor Replacement
This unique project required the existing tank to be elevated 4’ above its existing granular base. The 110’-0” diameter, multi-bay tank was…
Turnkey Operations On A Liquid Sulphur Tank – Central AB
Customer required an 8500 MT (30,000BBL) molten sulphur tank to be constructed. Elite Integrity Services executed a large scale turnkey operation on…