Field Tank Construction
Turnkey Operations On A Liquid Sulphur Tank – Central AB
Customer required an 8500 MT (30,000BBL) molten sulphur tank to be constructed. Elite Integrity Services executed a large scale turnkey operation on this project from civil work, piling, concrete foundation, construction, hydrotest, insulation and final bolt up. This tank consisted of very precise complicated ABSA registered fittings that took a high level of expertise to install. This work was completed in the winter months during the heavy impacts of the Covid-19 pandemic and was executed safely and on schedule.
Project Highlights:
- Double Jacketed Nozzles and Manways
- High Pressure Piping
- Self-supported Roof
- Custom Heat Coil Assemblies
- Complex Galvanized Roof Structure to provide customer safe access for servicing heat coils, steam straps and jacketed valves
- Shell Insulation (5 inch Thick)
- Project Size: 63' Diameter x 56' High
- Project Type: New Construction
- Completion Date: June 2021
- Service: Liquid Sulphur
More Projects
New Tank Construction – Growing Client’s Inventory Capacity
An addition to their site in Central Alberta, meant this clients overall storage capacity at their rail terminal would be more than…
New Tank Construction – Central Alberta
This 70,000 bbl tank moved from concept to completion in just over (3) months. Due to market volatility in 2020, the client…
Inner City Tank Construction
With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the…
Tank Repair – Major Foundation Remediation & Tank Floor Replacement
This unique project required the existing tank to be elevated 4’ above its existing granular base. The 110’-0” diameter, multi-bay tank was…
Turn Around Tank Replacement
Elite Integrity Services was recently contracted to complete an entire tank replacement project inside our clients 5-day turn around window. Working closely…